Back in Joisey, I had to pour 6 concrete columns 3 feet into the ground and strap that shed down. Anything over 100 sq. Ft.
It's 42" here but I never get anything inspected. I was thinking this if I ever built a shed:
[ Attachment Invalid Or Does Not Exist ]
[ Attachment Invalid Or Does Not Exist ]